URJ Camp Newman Phase IV
Camp Newman Phase 4 consists of a new maintenance building, a water storage tank with usable capacity of 200,000 gallons, cabin dormitories, bunk houses with bathrooms housing approx. 80 campers per cabin, and multiple outdoor gathering spaces strategically placed throughout the site landscaping. As Camp Newman continues to rebuild and welcome back campers for the summer, the need for camper housing is at the top of their list. With a window of 10 short months to complete construction of the dormitories, preconstruction and design-build services were of utmost importance. FDC and URJ are working closely and diligently on design and schedule during preconstruction to maximize the time spent in the field.
project features
Site Improvements and Landscaping
200,000+ gal Storage Tank
3,000 SF Storage/Maintenance Building